Delivering On Time
Traditionally the construction industry has a reputation for being unable to deliver on time. Panelised Timber Frame construction through Canadian Timber Schools UK is anything but traditional and we can help to ensure that your project really will come in on time.
Faster Build Time
An average 40% shorter construction time compared to brick and blockwork not only help with costs. A shorter build time also means greater control over labour, resources and allow for better predictability of each stage of the project.
Brickwork removed from Critical Path
By removing brickwork from the critical path, other trades can be working on their own areas before the brickwork stage is complete. This will result in further reductions in projec times as different stages can be carried out in parallel rather than one by one.
Reduced Drying-Out Time
A reduced drying out time allows internal finishing to begin much sooner and leads to a quicker project completion. There is also less risk from shrinkage and expensive call-backs to rectify construction faults found with other methods.